Case Studies - 12/2020

December 28, 2020

High Density Fireproofing on Steel Legs

A Fortune 500 industrial goods company hired TMI Coatings, Inc. (TMI) to do high density fireproofing to steel tank legs of a liquid gas storage tank. The owner needed work…

December 22, 2020

Hangar Floor Restoration for US Air Force

Three semi-truck loads of flooring materials later, this 40,000 square foot decades-old hangar floor was restored to new by TMI Coatings, Inc. (TMI).  TMI completed installation weeks before the project…

December 17, 2020

Providing Solutions by TMI Coatings

TMI Coatings Inc. (TMI) business is simple – we are providing solutions to problems. Whether your floor, ceiling, tank, or other structure needs restoration, TMI is here to serve you.…

December 4, 2020

Containment Dike Joint Sealing

After the containment dike restoration project, Ben Nesseth of McCormick Construction said, “I think everything went well. Your guys did a great job.” A chemical manufacturer utilizes containment dikes to…