skip to Main Content
651-452-6100 tmi@tmicoatings.com

Cargill Pedestrian Deck Restoration

TMI Coatings completed severe restoration of a concrete deck for a major Cargill port facility along the Mississippi River. TMI mechanically abraded loading dock floors and repaired damaged areas prior to installing a cementitious urethane floor topping. TMI used sloping material to reestablish the crown and drainage prior to installing floor topping to two loading dock areas totaling over 3,500 sq. ft. The owners were very pleased with TMI’s work as it addressed their safety concerns. Eric, Maintenance and Reliability Leader stated, “crew was excellent to work with, did not complain and were very professional and hardworking. Worked well with us to keep operations running while still performing the work. The final product came out beautiful and addressed our safety concerns. TMI will definitely be invited to do more work in the near future for me”.  The owner also stated his satisfaction with the site cleanliness throughout the project.

 Cargill loading dock before TMI Coatings prepared and applied new coating

With 35 years of experience, TMI Coatings will have your project completed on time and within budget. Contact us today at 651-452-6100 for your free, no obligation quote.

TMI Coatings Request a Quote

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
Cementitious urethane topping on loading dock along Mississippi River

Related Posts

Back To Top