New Concrete Floor Coated 7 Days After Poured

TMI Coatings applied a cementitious urethane floor topping for a booming salsa manufacture that first sold its goods at farmers markets in the Midwest. A new production facility used for creating salsa required floors to be protected from the acidic constantly wet environment. The cementitious urethane floor topping was applied within 7 days after the new concrete was poured; this enabled the company to have their salsa creating fully operational within a shorter time period. “Every bite proves that our hard work is worth the effort.” This is good salsa!