Restoration of Eroded Concrete Pit in Texas
TMI Coatings, Inc. (TMI) was recently contracted to apply a chemical-resistant lining to a severely eroded wastewater concrete pit for a biofuels plant in West Texas. This work was performed…
TMI Coatings, Inc. (TMI) was recently contracted to apply a chemical-resistant lining to a severely eroded wastewater concrete pit for a biofuels plant in West Texas. This work was performed…
Cold temperatures limit contractors’ abilities to apply protective coatings. In late fall of 2022, a biodiesel manufacturer needed TMI Coatings, Inc.’s (TMI) assistance lining an outdoor 35% hydrochloric containment dike.…
A publicly traded home solutions company contracted TMI Coatings, Inc. (TMI) to paint a methanol tank and its containment. The tank hadn’t been painted in quite some time, plus the…
An old coal burning power plant converted to gas-fired burners years ago, a difficult construction feat because of the new equipment such as gas piping needing to be built around…