/category/specialty-coatings/page/16/
category/specialty-coatings/page/16
category/specialty-coatings/page/16
category/specialty-coatings/page/16
category
specialty-coatings
category
specialty-coatings
November 5, 2010
The TMI Coatings team recently completed a recoating project for the City of Brodhead Wastewater Treatment Facility. The facility has two fiberglass domes, each 45’ in diameter with a connecting…
October 27, 2010
Jeff Skiba, the facility manager at the ADM elevator, commented, “The bins and logo turned out beautiful. I love it. They turned out nice.” TMI Coatings, Inc. (TMI) was contracted…
September 3, 2010
A food manufacturer recently hired TMI Coatings, Inc. (TMI) to restore one of their facilities and create a safe, sanitary food preparation area with CO2 blasting. The existing coating was…
August 23, 2010
TMI Coatings, Inc. (TMI) recently repaired and repainted this 38’ tall brick chimney for a Minneapolis printing company. Prior to TMI’s arrival, this structure consisted of loose bricks on top…
June 30, 2010
A food plant was experiencing chipping and peeling lead-based paint, which was causing a safety hazard. As a result, the food plant hired TMI Coatings, Inc. (TMI) to remove the…
June 23, 2010
Is peeling or flaking paint an issue at your food or beverage plant? Do you have a consistent wet/humid environment? Do you have to repaint on a regular basis? Does…
June 15, 2010
While restoring other structures for this large grain facility in the U. S. TMI Coatings, Inc. (TMI) also restored a grain conveyor that extended over the Mississippi River from Illinois…
June 8, 2010
UV weathering can cause fiberglass to deteriorate over time. When this occurs, the fiberglass loses its strength and durability; the performance and safety of these structures are put into jeopardy.…
June 2, 2010
TMI Coatings, Inc. (TMI) was contracted to restore the 140’ tall silos and head house. Weathering was deteriorating the old coatings and structural integrity of the concrete. The silos and…
March 24, 2010
TMI Coatings recently completed a project with stringent time requirements. The deadline of February 21 gave the team less than a week to complete a flooring project, which usually is…