skip to Main Content

Cooling Tower Basin Restoration

TMI Coatings recently completed extensive restoration to a concrete cooling tower basin at an Oilseed Processing plant. To restore this severely eroded basin TMI removed loose and hollow concrete with chipping hammers, hand grinders and other mechanical means. The crew then pressure washed the areas to remove the remaining dirt, debris and foreign containments. The exposed concrete areas were dampened with water to allow a thin scrub coat to be applied, followed immediately by patching and filling with new concrete formed to the original plane using MasterEmaco. After the new mortar cured it was primed and coated using a urethane elastomer. Due to the extensive restoration that was needed to restore the cooling tower basin, the crew worked overtime. The CHS site contact noted, “Everything looks really good. Aside from the additional restoration/cleaning work, everything went well with the project.”

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn
CHS Mankato Cooling Tower Basin After TMI Coatings lined it

Related Posts

Back To Top