A mechanical company contracted TMI Coatings, Inc. (TMI) to sandblast and line the interior of a condensate tank at a private college dormitory. This tank was a crucial part of the heating system in this building, so work had to be done very quickly within a specific timeframe while students had leftover the Easter holiday. TMI consulted with the owner to select the most appropriate coating system and develop a plan to ensure project completion within the timeline.
Procedure:
- We sandblasted the entire interior of the tank with negative air to minimize dust.
- Removed sandblast abrasive for proper disposal.
- We applied 100% solids epoxy filler to the pitted areas to restore the substrate to the surrounding plane before using the lining.
- We installed a new tank lining to the interior of the tank.
- Force-cured the tank lining to ensure taste and odor-free improves the chemical resistance and reduces downtime.
Outcome:
TMI’s crew safely installed the new tank lining. Joe Pallansch, the site contact, was pleased with TMI’s work. He expressed that TMI’s Supervisor was very professional and courteous. Furthermore, Mr. Pallansch commented on how happy he was with TMI’s workmanship, clean-up, and project completion within the specified timeline. TMI Coatings. Safety. Quality. On time. In that order.