Scaffold Erection for Sandblasting on Military Hangar

TMI Coatings Inc. (TMI) has begun scaffold erection for sandblasting and removing lead paint from a military airplane hangar.  The structure is over 120′ long and 75′ high.  Prior to sandblasting, TMI will surround the entire structure with scaffolding, including poly wrapping, to contain the debris as well as to safely work from, while adhering to strict engineering requirements.  TMI was able to do this while still keeping the structure functional for military use. 

 

Mississippi River Conveyor Project

Mississippi River Conveyor Project

While on site completing restoration and coating of silos and a head house at a grain facility in Iowa, TMI Coatings prepared and coated a conveyor over the Mississippi River,…

read more
Protective Flooring At Manufacturing Company

Protective Flooring at Manufacturing Company

A tortilla manufacturing company requested TMI Coatings install protective flooring at their facility in their Production and Packaging Areas totaling 13,000 square feet.  In the Packaging Area, 6,500 sq. ft.,…

read more