TMI Coatings Dismantles and Demolishes a 1,500,000 Gallon Steel Tank

The City of Cedar Park, Texas awarded TMI Coatings a contract to dismantle and demolish their standpipe that contained lead paint.

TMI removed lead containing paint prior to dismantling the tank.  Paint removal was performed with a vacuum shrouded power tool.  After removal of the lead paint, the tank was cut, dismantled and disposed of.  At completion of the demolition, TMI will take post soil samples to confirm the soil is clean of lead paint from the demolition process.

Elevated Water Tank Rehabilitation

Elevated Water Tank Rehabilitation

TMI Coatings, Inc. rehabilitated an elevated water tank for the City of Princeton.  The tower was constructed in 1964 and last coated by TMI Coatings in 1996.  After structural repairs…

read more
Minneapolis Skyway Painting

Minneapolis Skyway Painting

Painting skyway bridges in downtown locations can be challenging in many ways. Projects of this nature are highly visible requiring professionalism and quality workmanship done in a timely manner to…

read more
TMI Training

TMI Training

Alex Buetow of TMI Coatings is reviewing with a crew member how to properly read and adhere to material product data sheets for the coating being used on site.  

read more